10
Battery Upgrade Instructions for 93E (20–60 kVA)
P-164000967—Rev 01
Figure 10. Battery Wiring Adapter Connection to Battery Tray Cabling
Verify battery voltage polarity at the battery fuses (Gen 1 & 2) and the UPS battery breaker (Gen 3, top side
on the breaker). The measured voltage is around “+230vdc”