Action
Yes/No
The area around the installed UPS system is clean and dust-free (it is
recommended that the UPS is installed on a level floor suitable for
computer or electronic equipment).
There is adequate workspace around the UPS and other cabinets.
Adequate lighting is provided around all the UPS equipment.
A 230 VAC service outlet is located within 7.5 meters of the UPS
equipment.
Startup and operational checks are performed by an authorized Eaton
Customer Service Engineer or by a qualified service personnel
authorized by Eaton.
4.2.1
Parallel system installation checklist
Action
Yes/No
Each cabinet in the parallel system is placed in its installed location.
All conduits and cables are properly routed to the UPSs and to the
parallel tie cabinet.
A readily accessible disconnect device is installed between the UPS
input and utility power.
All power cables are properly sized and terminated.
Neutral conductors are installed between the cabinets as required.
Ground conductors are properly installed.
CAN wiring between the UPSs is properly installed.
Pull chain wiring between the UPSs is properly installed.
There is adequate workspace around the UPSs, parallel tie cabinet,
and other cabinets.
UPS outputs are separated by MOBs with dual auxiliary contacts for
the control of the system.
Startup and operational checks are performed by an authorized Eaton
Customer Service Engineer or by a qualified service personnel
authorized by Eaton.