Eaton 93E UPS 15-80 kVA (380/400/415 V)
Installation and Operation Manual
© Eaton Corporation plc 2015. All rights reserved.
Revision: 001
Document ID: 614-01975-00
114 (133)
7.4.9
Battery test
NOTE: This UPS has a user initiated battery test intended to determine
if the batteries are able to support the load.
The battery test is only able to be initiated when the battery is fully
charged. This normally occurs within 72 hours of the start of a charging
cycle. The command will not be shown if the test is not able to be run.
To start an individual UPS battery test:
1.
Select the CONTROLS symbol in the main menu bar on the UPS to
be tested.
The System Control screen is displayed.
2.
Select Battery in the System Control screen.
3.
In the Battery System Control screen, select the RESTING
→
TESTING command and press the
push button.
7.4.10
Using the UPS LOAD OFF command
A UPS Load Off is initiated by selecting the Load Off command in the
UPS Control screen. The UPS LOAD OFF controls the UPSs output by
powering down the UPS and de-energizing the critical load.
The UPSs (including bypass) remains off until restarted.
To use the LOAD OFF command:
1.
Select the CONTROLS symbol in the main menu bar on the UPS to
be shut down.
The System Control screen is displayed.
2.
Select UPS in the System Control screen.
3.
In the UPS System Control screen, select the NORMAL
→
LOAD
OFF or BYPASS
→
LOAD OFF command depending on the UPS
mode, then press the
push button.
The Verify Action screen is displayed, providing you with a choice to
proceed or abort the shutdown.