NOTE: Startup and operational checks must be done by an authorized Eaton Customer
Service Engineer or by qualified service personnel authorized by Eaton, or the warranty
terms specified in the Warranty become void.
Before you install the UPS system, read and understand how these instructions apply to
the system that you are going to install. Use the procedures and illustrations provided to
make a logical plan for installing the system.
For the UPS system to operate at peak efficiency, the installation site must meet the
environmental parameters outlined in the Eaton 93PM UPS 100-500 kVA
User’s
and
Installation Guide.
The installation environment must meet the UPS weight and size requirements provided in
Tables 1 and 2.
The dimensions of the UPS cabinet are shown in illustration 2. Note that the depth
dimension includes cable glands.
Table 1. UPS cabinet weights with cardboard packaging
UPS model
Shipping weight
[kg]
Installed weight
[kg]
Floor loading [kg/m
2
]
93PM-100(400)
720
680
439
93PM-150(400)
785
745
540
93PM-200(400)
850
810
587
93PM-250(400)
915
875
635
93PM-300(400)
980
940
682
93PM-350(400)
1045
1005
729
93PM-400(400)
1110
1070
776
93PM-100(500)
720
680
439
93PM-150(500)
785
745
540
93PM-200(500)
850
810
587
93PM-250(500)
850
810
587
93PM-300(500)
915
875
635
93PM-350(500)
980
940
682
93PM-400(500)
1045
1005
729
93PM-450(500)
1110
1070
776
93PM-500(500)
1110
1070
776
EN
44
Summary of Contents for 93PM-100(400)
Page 133: ...131 131 ...
Page 134: ...132 132 ...
Page 135: ...133 133 ...
Page 136: ...134 134 ...
Page 137: ...135 135 ...