The final step in installing the IAC-D is completing the following Installation Checklist. This checklist ensures
that you have completely installed all hardware, cables, and other equipment. Complete all items listed on the
checklist to ensure a smooth installation. Make a copy of the Installation Checklist before filling it out, and
retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system for the
first time.
44..88
IInnssttaallllaattiioonn C
Chheecckklliisstt
o
All packing materials and restraints have been removed from each cabinet.
o
The IAC-D is installed on a level floor suitable for computer or electronic equipment.
o
The IAC-D is placed in its installed location
o
The IAC-D is secured to the building floor or attached to the adjacent 93PM system cabinet with the cabinet
bracket
o
All conduits and cables are properly routed between the IAC-D and the UPS.
o
All power cables are properly sized and terminated.
o
Distribution Panel branch circuit breakers are installed and wired to load.
o
A ground conductor is properly installed.
o
All terminal cover plates are installed.
o
Air conditioning equipment is installed and operating correctly.
o
The area around the UPS system is clean and dust-free.
o
Adequate workspace exists around the IAC-D and other cabinets.
o
Adequate lighting is provided around all IAC-D and UPS equipment.
o
A 120 Vac service outlet is located within 7.5 meters (25 feet) of the IAC-D and UPS equipment.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
o
Visit
www.eaton.com/pq/register
to register your new Eaton UPS / Eaton UPS Accessory.