Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09
2.
If not already open, open the front door (see
) by lifting the latch from the bottom and turning to
the right (counterclockwise) and swing the door open).
3.
Loosen the screws securing the inside distribution panel door and swing the door open.
4.
Remove the screws securing the breaker trim plate and remove the plate. Retain trim plate and hardware
for later use.
5.
If wiring the IAC-D input power terminals using the inter-cabinet wiring access pass-through (line-up-and-
match configurations), proceed to
; if wiring the IAC-D input power terminals using the bottom entry
access, proceed to
; if wiring the IAC-D input power terminals using the top entry access, proceed
to
6.
Pass-through Wiring.
Route the IAC-D input cables (phase A, B, and C and Ground) from the UPS cabinet
through the bottom UPS and IAC-D inter-cabinet wiring access pass-through to the IAC-D input terminals.
See
for IAC-D wiring access information and
for IAC-D terminal locations. See
paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination
requirements. Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS terminal locations and termination requirements.
7.
Proceed to
.
8.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IAC-D. Identify all conduit requirements (both input and output) and mark their location. Drill and punch all
conduit holes in the bottom conduit plate prior to mounting on the IAC-D. Install the conduit plate and
install all conduit runs into the plate. Pull the wiring through conduit into the wiring area.
9.
Route the output cables (phase A, B, and C and Ground) from the UPS through the bottom of the cabinet
to the IAC-D input terminals. See
for IAC-D terminal locations. See paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination requirements.
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
10. Proceed to
.
11.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IAC-D. Identify all
conduit requirements (both input and output) and mark their location. Drill and punch all conduit holes in
the top conduit plate prior to mounting on the sidecar. Install the conduit plate and install all conduit runs
into the plate. Pull the wiring through the conduit into the wiring area.
12. Route the output cables (phase A, B, and C and Ground) from the UPS through the top of the cabinet to the
IAC-D input terminals. See
for IAC-D terminal locations. See paragraph
IAC-D Power Wiring Preparation
, and
for IAC-D wiring and termination requirements.
Refer to the applicable Eaton 93PM UPS manual, listed in paragraph
, for the UPS
terminal locations and termination requirements.
13. Connect the Ground and phase A, B, and C power wiring to the corresponding input terminals on the IAC-
D.
For a detailed view of the IAC-D input terminals, see
.
14. Connect the Ground and phase A, B, and C power wiring to the corresponding output terminals on the
UPS.
15. Proceed to paragraph
50 kW and 100 kW Output Wiring
for 50 kW and 100 kW output wiring or
Two-Hole Barrel Lug Terminations to Bus Bar Installation
for 150 kW and 200 kW output wiring.