Eaton 93PM Integrated Accessory Cabinet-Distribution (50–200 kW) Installation and Operation Manual P-164000229—Rev 09
55
10. If adjustable subfeed breakers are installed, proceed to paragraph
to
adjust current trip settings; otherwise, proceed to
11. Locate the external wiring terminal hardware kit (see
) packed at the bottom of the IAC-D.
12. Route output cables from output breaker to the critical load. See
for IAC-D output, neutral, and
ground terminal locations. See paragraph
IAC-D Power Wiring Preparation
,
and
for
IAC-D wiring and termination requirements..
13. Using hardware from the external wiring terminal hardware kit, Connect Ground, phase A, B, and C, and
Neutral power wiring to the output breaker and the critical load.
For a detailed view of the IAC-D terminals, see
14. Reinstall the inside trim plate removed in
15. Close the inside door and secure with screws.
16. Close the outside door and secure the latch.
17. After the IAC-D is installed and wired, return to the applicable Eaton 93PM UPS installation and operation
manual listed in paragraph
to complete the UPS wiring.