28
Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05
Table 17. External Input Power Cable Terminations for the Eaton 93PM 100 kW IAC-T 1+1, 2+0, 2+1, 3+0, 3+1, and 4+0
Parallel Configurations – with MIS and MBP (Continued)
Terminal Function
Termi-
nal
Func-
tion
Number and Size of
Pressure Termination
(AWG or kcmil)
Tightening
Torque Nm
(lb in)
Size Screw and
Type
MOB1–
5C
Phase C
1 – 4–4/0
13.5 (120)
3/16” Hex
GND
Ground
2 – 14– 1/0
5.1 (45)
Slotted
AC Input to MOB 2 from UPS 2
MOB2–
1A
Phase A
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB2–
3B
Phase B
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB2–
5C
Phase C
1 – 4–4/0
13.5 (120)
3/16” Hex
TBG
Ground
2 – 14– 1/0
5.1 (45)
Slotted
AC Input to MOB 3 from UPS 3 (if
installed)
MOB3–
1A
Phase A
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB3–
3B
Phase B
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB3–
5C
Phase C
1 – 4–4/0
13.5 (120)
3/16” Hex
TBG
Ground
2 – 14– 1/0
5.1 (45)
Slotted
AC Input to MOB 4 from UPS 4 (if
installed)
MOB4–
1A
Phase A
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB4–
3B
Phase B
1 – 4–4/0
13.5 (120)
3/16” Hex
MOB4–
5C
Phase C
1 – 4–4/0
13.5 (120)
3/16” Hex
TBG
Ground
2 – 14– 1/0
5.1 (45)
Slotted
AC Input to Maintenance Bypass
(1+1)
MBP–
1A
Phase A
1 – 4–4/0
13.5 (120)
5/16” Hex
MBP–
3B
Phase B
1 – 4–4/0
13.5 (120)
5/16” Hex
MBP–
5C
Phase C
1 – 4–4/0
13.5 (120)
5/16” Hex
AC Input to Maintenance Bypass
(2+0 and 2+1)
MBP–
1A
Phase A
1 – 4–350
28.2 (250)
5/16” Hex
MBP–
3B
Phase B
1 – 4–350
28.2 (250)
5/16” Hex
MBP–
5C
Phase C
1 – 4–350
28.2 (250)
5/16” Hex
AC Input to Maintenance Bypass
(3+0, 3+1, and 4+0)
MBP–
1A
Phase A
1 – 2 stud bus bar
mounting
12.2 (108)
M8 Stud with 13 mm
Hex Nut
Summary of Contents for 93PM IAC-T Series
Page 98: ...P 16400037105 P 164000371 05 ...