Eaton 93PM Integrated Accessory Cabinet-Tie (50 kW and 100 kW IAC-T) Installation and Operation Manual P-164000371—Rev 05
55
Figure 26. Power Output Terminal Detail – 3+0, 3+1, and 4+0 with MIS and MBP
Phase A
Phase C
Phase B
AC Input to
Maimtenance
Bypass
MBP
2-Stud Bus Bar
Terminal
44..44
IInnssttaalllliinngg IIA
AC
C--TT IInntteerrffaaccee C
Coonnnneeccttiioonnss
NOTE 1
IAC-T MOB, pull chain, and MBP auxiliary contact control interface wiring can be
installed using the inter-cabinet wiring access pass through (line-up-and-match
configurations) or conduit between cabinets (standalone configurations).
NOTE 2
If using conduit, install the control wiring in separate conduit from the power wiring.
NOTE 3
Remove the IAC-T conduit landing plates to drill or punch conduit holes, or remove
knockouts in the conduit plate (see
NOTE 4
Any pair of unused UPS building alarm terminals may be used for the MOB and MBP
interface connections.