To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. Refer to the applicable Eaton
93PM UPS Installation and Operation manual, listed in paragraph
, for UPS
operating procedures.
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If not already removed, remove the screws securing the internal safety shield panel and remove the panel
to gain access to the interface terminals. Retain the hardware for later use.
4.
If wiring the IAC-T interface terminals using the inter-cabinet wiring access pass-through (line-up-and-
match configurations), proceed to
; if wiring the IAC-T input power terminals using the bottom entry
access, proceed to
; if wiring the IAC-T input power terminals using the top entry access, proceed to
5.
Pass-through Wiring.
Route the MOB, pull chain, and MBP (if installed) control wiring between the IAC-T
interface terminals and the UPS cabinet interface terminals using the inter-cabinet wiring access pass-
through. See
for wiring access information, and
for IAC-T interface terminal locations.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph
, for the UPS wiring access information, terminal locations, and termination
requirements.
6.
Proceed to
.
7.
Bottom Entry Wiring.
Route the MOB and pull chain control wiring between the IAC-T interface terminals
and the UPS cabinet interface terminals using the bottom entry conduit landing plates on the IAC-T and the
UPS. See
for wiring access information, and
for IAC-T interface terminal locations.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph
, for the UPS wiring access information, terminal locations, and termination
requirements.
8.
Proceed to
.
9.
Top Entry Wiring.
Route the MOB and pull chain control wiring between the IAC-T interface terminals and
the UPS cabinet interface terminals using the top entry conduit landing plates on the IAC-T and the UPS.
See
for wiring access information, and
for IAC-T interface terminal locations. Refer to
the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph
, for the UPS wiring access information, terminal locations, and termination
requirements.
10. Connect the MOB and pull chain control wiring to the IAC-T and UPS pull chain and building alarm
terminals. See paragraph
IAC-T Interface Wiring Preparation
and
for terminal block wiring
and termination requirements. See
or
and
for wiring information and terminal
assignments.
For a detailed view of the IAC-T terminals, see
, or
11. Reinstall the internal safety shield panel removed in
.
12. Close the outside door and secure the latch.
13. After the IAC-T is installed and wired, return to the applicable Eaton 93PM UPS Installation and Operation
manual, listed in paragraph
, to complete the UPS wiring.
Summary of Contents for 93PM IAC-T Series