P-164000249
30-200 kW
51
Revision 2
User's and Installation Guide
Figure 4-11: Simplified CAN and Pull-Chain wiring for parallel UPS system
NOTE
This drawing is for distributed bypass wiring purposes and is not a floor layout plan. UPSs can
be placed in any physical order.
NOTE
External CAN connections between UPSs require shielded twisted pair wire.
NOTE
Use twisted pair wiring between the UPS and MOB AUX contacts.
Figure 4-12: CAN and Pull-Chain wiring for parallel UPS with MOBs