Installation
4-16
Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual P-164000639—Rev 1
www.eaton.com/powerquality
4.
Top Entry Wiring.
Remove the top conduit plate (see Figure 4-9) from the top of the IBC–SW. Identify all
conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate
prior to mounting on the IBC–SW. Install the conduit plate and install all conduit runs into the plate. Pull
the wiring through the conduit into the wiring area.
5.
Route the battery detect interface wiring from the UPS battery detect interface terminals through top of
the IBC–SW to the IBC–SW battery interface terminal block TB2. See Figure 4-10 for terminal locations.
See paragraph 3.2.3, Table 4-1, and Figure 4-11 for wiring and termination requirements. Refer to the
applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph 1.7, for UPS cabinet
terminal locations.
6.
Proceed to Step 10.
7.
Bottom Entry Wiring.
Remove the bottom conduit plate (see Figure 4-9) from the inside bottom of the
IBC–SW. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC–SW. Install the conduit plate and install all conduit runs
into the plate. Pull the wiring through the conduit into the wiring areas.
8.
Route the battery detect interface wiring from the UPS battery detect interface terminals through the
bottom of the IBC–SW to the wiring channel on the left side of the IBC–SW (see Figure 4-5). Route the
wiring along the wiring channel to the IBC–SW battery interface terminal block TB2. See Figure 4-10 for
terminal locations. See paragraph 3.2.3, Table 4-1, and Figure 4-11 for wiring and termination
requirements. Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in
paragraph 1.7, for UPS cabinet terminal locations.
9.
Secure the interface wiring to the wire tie anchors (see Figure 4-7) using Zip ties.
10. Connect the battery detect interface wiring to the IBC–SW battery detect interface terminals. See
paragraph 3.2.3 and Table 4-2 for termination requirements.
For a detailed view of the IBC–SW terminal block, see Figure 4-12.
11. Connect the battery detect interface wiring to the UPS battery detect interface terminals.Refer to the
applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph 1.7, for UPS cabinet
termination requirements.
12. Reinstall the internal safety shield panel removed in Step 3 of paragraph 4.3.1.
13. Install the front cover (previously removed) by carefully lowering the cover onto the bottom mounting
bolts. Secure the top of the cover with the two retained mounting bolts and tighten the bottom bolts.
14. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation
and Operation manual, listed in paragraph 1.7, to complete the UPS wiring.
NOTE
In multiple IBC–SW installations, route the battery interface wiring between
IBC–SWs through the top of the adjacent IBC–SW using the top inter-cabinet
access pass-through (see Figure 4-2 on page 4-5).
NOTE
In multiple IBC–SW installations, route the battery interface wiring between
IBC–SWs through the top of the adjacent IBC–SW using the top inter-cabinet
access pass-through (see Figure 4-2 on page 4-5).
NOTE
In the following step, if the safety shield cannot be reinstalled because of
misalignment, use the leveling feet to realign the cabinet.