Installation
4-20
Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual P-164000639—Rev 1
www.eaton.com/powerquality
Figure 4-12. Interface Terminal Detail – Eaton 93PM IBC–SW
NOTE 1
TB2 connector pin 1 is located at the bottom of the terminal block.
NOTE 2
Because of the battery shunt trip wiring route in the 93PM UPS cabinet, the wiring from
the IBC–SW battery shunt trip terminals to the UPS must use wire rated for 600V and
Class 1 wiring methods.
NOTE 3
The Thermal Sensor is optional. If not installed, terminals TB2-9, and TB2-10 are not used.
TB2
IBC-SW
1
10
Not Used
Battery Detect
Not Used
Battery Shunt Trip +
Battery Shunt Trip –
To Next IBC TB2-4 (Battery Detect Common)
To Next IBC TB2-1 (Battery Shunt Trip +)
To Next IBC TB2-2 (Battery Shunt Trip –)
Thermal Sensor Return
Thermal Sensor