48
Eaton 93PM Universal Integrated Battery Cabinet (IBC-LW and IBC-LHW) Installation Manual P-164000541—Rev 04
4.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IBC. Identify all
conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate prior
to mounting on the IBC. Install the conduit plate and install all conduit runs into the plate. Pull the wiring
through the conduit into the wiring area.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
5.
Route the battery detect interface wiring from the UPS battery detect (building alarm) interface terminals
through the top of the IBC and the top IBC inter-cabinet wiring access pass-through (see
) to the
IBC battery interface terminal block TB2. See
for terminal locations.
6.
Proceed to
7.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE 1
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
NOTE 2
In the following step, leave slack in the interface cables to allow breaker tray movement.
8.
Route the battery detect interface wiring from the UPS battery detect (building alarm) interface terminals
through the bottom of the IBC up the left flange of the center channel to the IBC battery interface terminal
block TB2. See
for terminal locations.
9.
Connect the battery detect interface wiring to the IBC battery detect interface terminals. See
for
termination requirements.
For a detailed view of the IBC terminal block, see
10. Connect the battery detect interface wiring to the UPS battery detect interface (building alarm) terminals.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
, for UPS cabinet termination requirements.
11. Proceed to paragraph
Summary of Contents for 93PM IBC-LW