Eaton 93PM-L 20 – 60 kW (208V) UPS Installation and Operation Manual P-164000711—Rev 03
59
24. Using the retained cabinet mounting bolts, install the floor mounting brackets to the left and right side of
the UPS with the angle facing outward.
25. Secure the cabinet to the floor with customer-supplied hardware.
26. Proceed to
Step 30
.
27. Locate the front and back floor mounting brackets from the optional floor mounting kit.
28. Using the retained cabinet mounting bolts, install the floor mounting brackets to the front and rear of the
UPS with the angle facing outward.
29. Secure the cabinet to the floor with customer-supplied hardware.
NOTE
Black cover dots are provided, if side mounting bracket holes need to be covered for
aesthetic reasons.
30. Locate the black cover dots from the parts kit and install over the left and right side bracket mounting
holes.
31. Proceed to paragraph
Integrated Battery Cabinet Installation
Figure 23. Removing the Sidecar Rear Shipping Bracket – UPS with Right-Mounted Sidecar
BACK VIEW
(TOP EXHAUST OPTION)
BACK VIEW
(TOP EXHAUST OPTION)
UPS WITH TOP ENTRY SIDECAR
UPS WITH BYPASS SIDECAR (SIAC-B)
REAR SHIPPING
BRACKET
Summary of Contents for 93PM-L 60-1
Page 4: ......
Page 164: ...P 16400071103 P 164000711 03 ...