134
Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
2.
To deactivate the REPO switch in preparation for restarting the UPS, insert the supplied key and rotate
clockwise until the red pushbutton releases (see
). To remove the key, rotate the key back to the
vertical position.
3.
Restart the UPS by following the procedure in paragraph
Starting the UPS in Double Conversion Mode
or
Starting the UPS in Bypass Mode
WARNING
Power is present inside the UPS cabinet until the upstream input feeder circuit breakers and battery breakers
are opened.
Figure 61. REPO Operation
Activated
(Pushbutton locked into place.)
Deactivated
(Unlock pushbutton to release.)
Summary of Contents for 93PM-L IAC-B
Page 162: ...16400072401 164000724 01 ...