Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
44..66..33
IInnssttaalllliinngg B
Baatttteerryy S
Shhuunntt TTrriipp IInntteerrffaaccee C
Coonnnneeccttiioonnss
NOTE 1
If installing interface wiring connections between standalone cabinets, conduit must be
installed between cabinets.
NOTE 2
Disconnect terminal block plugs from terminal blocks to wire plugs.
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 6, “UPS Operating
Instructions,“ for shutdown instructions.
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If not already removed, remove the screws securing the wireway hang panel and remove the panel. Retain
the hardware for later use.
4.
If not already removed, remove the screws securing the bottom internal safety shield panel and remove
the panel. Retain the hardware for later use.
5.
Remove the screws securing the internal safety shield panel above the bottom safety panel and remove
the panel to gain access to the battery shunt trip wiring terminals. Retain the hardware for later use.
6.
If wiring the battery shunt trip connections using the inter-cabinet wiring access pass-through (line-up-and-
match configurations), proceed to
; if wiring the battery shunt trip connections using bottom entry
access, proceed to
; if wiring the battery shunt trip connections using top entry access, proceed to
.
7.
Pass-through Wiring.
Route the battery shunt trip wiring from the battery cabinet through the bottom
UPS inter-cabinet wiring access pass-through to the UPS battery shunt trip terminals. See
for
UPS wiring access information, and
and
for UPS terminal locations. Refer to the
Eaton
93PM Universal Integrated Battery Cabinet Installation Manual-Large and Large High Rate
, or the
Eaton
93PM Integrated Battery Cabinet-Small Welded IBC-SW (432V and 480V) Installation Manual
, listed in
paragraph , for battery cabinet wiring access information and instructions.
8.
Proceed to
.
9.
Bottom Entry Wiring.
Route the battery shunt trip wiring from the battery cabinet or battery disconnect
through the bottom of the UPS to the UPS battery shunt trip terminals. See
for UPS wiring
access information, and
and
for UPS terminal locations. Refer to the
Eaton 93PM
Universal Integrated Battery Cabinet Installation Manual-Large and Large High Rate
, or the
Eaton 93PM
Integrated Battery Cabinet-Small Welded IBC-SW (432V and 480V) Installation Manual
, listed in paragraph
1.8, for battery cabinet wiring access information and instructions.
10. Proceed to
.
11.
Top Entry Wiring.
Route the battery shunt trip wiring from the battery cabinet or battery disconnect
through the top of the UPS and the bottom UPS inter-cabinet wiring access pass-through to the UPS
battery shunt trip terminals. See
for UPS wiring access information, and
and
for UPS terminal locations. Refer to the
Eaton 93PM Universal Integrated Battery Cabinet Installation
Manual-Large and Large High Rate
, or the
Eaton 93PM Integrated Battery Cabinet-Small Welded IBC-SW
(432V and 480V) Installation Manual
, listed in paragraph 1.8, for battery cabinet wiring access information
and instructions.
12. Connect the wiring to the battery shunt trip terminals. See paragraph
and
for wiring
and termination requirements, and
for terminal assignments.
13. If wiring bypass shunt trip interface connections, proceed to paragraph
Installing Bypass Shunt Trip Interface Connections
;If wiring generator interface connections, proceed
to paragraph
Generator Interface Connections
; if wiring Minislot connections, proceed to paragraph
Summary of Contents for 93PM-L IAC-B