Startup may be performed by the customer’s battery qualified electrical contractor for single (not parallel) UPS
installations without any accessory cabinets such as an External Battery Cabinet.
Startup and operational checks for parallel systems or installations with accessory cabinets must be performed
by an authorized Eaton Customer Service Engineer, or the warranty terms specified on page Warranty become
void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in
advance (usually a two-week notice is required) to reserve a preferred startup date.