Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07
107
77..44
M
Muullttiippllee EExxtteerrnnaall P
Paarraalllleell S
Syysstteem
m O
Oppeerraattiioonn
NOTE 1
If an Integrated Battery Cabinet (IBC) is installed, refer to its installation and operation
manual, listed in
Chapter 1
Introduction
,
For More Information
section, for IBC
battery breaker location.
NOTE 2
If a Sidecar Integrated Accessory Cabinet (SIAC) or an Integrated Accessory Cabinet
(IAC) is installed, refer to its installation and operation manual, listed in
Chapter 1
Introduction
,
For More Information
section, for operating instructions.
NOTE 3
This unit is a three-wire device. The loss of a single input phase will be considered a
complete loss of input power and discharge the battery to provide power to the load.
77..44..11
S
Sttaarrttiinngg tthhee P
Paarraalllleell S
Syysstteem
m iinn D
Doouubbllee C
Coonnvveerrssiioonn M
Mooddee
To start the UPS system:
1.
Close all Module Output Breakers (MOBs).
2.
Close the UPS input feeder circuit breaker.
3.
If dual feed, close the UPS bypass feeder circuit breaker.
4.
If IBCs are installed, close the battery breakers.
5.
Observe the UPS control panel display becoming active, indicating logic power.
6.
Verify no alarms are active.
7.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
8.
Tap the
GO ONLINE
button.
9.
If requested, enter the Level 1 password. Default password is 1111.
The rectifier and inverter turn on. The inverter continues to ramp up to full voltage.
Once the inverter reaches full voltage, all UPS inverter switchgear close and the static switches turn off.
Power is now supplied to the critical load in dual conversion mode from all UPSs. It takes approximately
one minute for the UPSs to achieve the dual conversion mode.
The Normal status indicator is illuminated.
77..44..22
S
Sttaarrttiinngg tthhee P
Paarraalllleell S
Syysstteem
m iinn B
Byyppaassss M
Mooddee
If the inverter output of the UPS is not available and the critical load needs to be energized:
CAUTION
In Bypass mode, the critical load is not protected from commercial power interruptions and abnormalities.
1.
Close all Module Output Breakers (MOBs).
2.
Close the UPS input feeder circuit breaker.
3.
If dual feed, close the UPS bypass feeder circuit breaker.
4.
If IBCs are installed, close the battery breakers.
5.
Observe the UPS control panel display becoming active, indicating logic power.
6.
Verify no alarms are active.
7.
Tap the
CONTROLS
tab on the main menu navigation bar. The System Control screen is displayed.
8.
Tap the
GO TO BYPASS
button.
Summary of Contents for 93PM Series
Page 4: ......
Page 138: ...16400022707 164000227 07 ...