Eaton 93PM 50-100 kW SIAC-T and 50-100 kW SIAC-TB Installation and Operation Manual P-164000370—Rev 04
9
C
Chhaapptteerr 33 IInnssttaallllaattiioonn P
Pllaann aanndd U
Unnppaacckkiinngg
NOTE
The SIAC-T or SIAC-TB is attached to and directly integrated with one of the UPS
cabinets at the factory for use in a two UPS parallel system. The SIAC-T and SIAC-TB are
designed to be located between two UPS in a line-up-and-match configuration. This
section must be used along with the applicable Eaton 93PM UPS Installation and
Operation manual during installation planning and unpacking.
This chapter includes planning for the Eaton 93PM 100 kW Sidecar Integrated Accessory Cabinet-Tie (SIAC-T)
or the Eaton 93PM 100 kW Sidecar Integrated Accessory Cabinet-Tie Bypass (SIAC-TB).
Use the following basic sequence of steps to install the SIAC-T or SIAC-TB:
1.
Create an installation plan for the SIAC-T or SIAC-TB.
2.
Prepare your site for the SIAC-T or SIAC-TB.
3.
Inspect and unpack the SIAC-T or SIAC-TB.
4.
Unload and install the SIAC-T or SIAC-TB.
5.
External wire the SIAC-T or SIAC-TB.
6.
Complete the Installation Checklist.
7.
Have authorized service personnel perform preliminary operational checks and start up the system.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on the product's resources page
become void. See
for details. This service is offered as part of the
sales contract for the UPS. Contact an Eaton service representative in advance (a
minimum two-week notice is required) to reserve a preferred startup date.
33..11
C
Crreeaattiinngg aann IInnssttaallllaattiioonn P
Pllaann
Before installing the SIAC-T or SIAC-TB, read and understand how this manual applies to the system being
installed. Use the procedures and illustrations in this section to create a logical plan for installing the SIAC-T or
SIAC-TB.
33..22
P
Prreeppaarriinngg tthhee S
Siittee
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. The operating environment must meet the weight, clearance, and
environmental requirements specified for the applicable accessory cabinet. Specifications subject to change.
33..22..11
EEnnvviirroonnm
meennttaall aanndd IInnssttaallllaattiioonn C
Coonnssiiddeerraattiioonnss
The UPS system installation, including the SIAC-T and SIAC-TB, must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional
assistance with high altitude operation, contact an Eaton service representative (see paragraph
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The basic environmental requirements for operation of the SIAC-T and SIAC-TB are: