3.4 Instruction for Femoving the UPM Module Packaging
1. Cut off the packing strap and open the carton (see Figure 3-7);
2. Lift the foam on the UPM module upward to remove them (see Figure 3-7);
3. Take out the UPM module (see Figure 3-7).
NOTE
The UPS is heavy. It requires two people for transportation due to its weight.
NOTE
Check whether the UPS is damaged during the process of transportation or not. Should any damage be observed
or parts be found missing, do not start the machine. Contact the forwarder and distributor immediately.