25-75 kW
User's and Installation Guide
55
6
UPS OPERATING INSTRUCTIONS
This section describes how to operate the UPS.
NOTE
•
Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has been
performed by authorized service personnel.
•
The preliminary startup verifies all electrical interconnections to ensure the installation was successful and
the system operates properly.
•
Read these instructions and have a thorough understanding of UPS operation before attempting to operate
any of the controls.
•
The UPS is configured to operate with one of following nominal voltages: 380, 400, or 415 VAC.
•
Before operating the UPS, confirm the UPS nominal voltage and frequency from display by selecting Settings
-> Info.
•
If the UPS need to be operated with another voltage or frequency, contact your closest Eaton office or Eaton
authorized partner.
NOTE
The UPS in not a measuring device. All displayed measurements are only approximate values.
Summary of Contents for 93PR 25(75)
Page 1: ...User s and Installation Guide Eaton 93PR UPS 25 75 kW ...
Page 2: ......
Page 3: ...Eaton 93PR UPS 25 75 kW User s and Installation Guide ...
Page 96: ......
Page 97: ......
Page 98: ...614 02087 00 ...