Eaton 93PR 60-1200 kW UPS
Installation and Operation Manual
57
Copyright © 2021 Eaton Corporation plc. All rights reserved.
Table 4-1: Signal Cables Connection Between the Primary Cabinet and the Secondary
Cabinet
Primary Abinet
Cable
Primary
Cabinet
Cable Mark
Secondary
Cabinet Cable
Mark
Secondary
Cabinet Cable
Position
IP CT Cable
IP1 6PIN
IP1 6PIN
IP CT Cable
Rear upper
OP CT Cable
OP2 6PIN
OP2 6PIN
OP CT Cable
Rear
BYP Voltage
sampling cable
BYP1
BYP1
BYP Voltage
sampling cable
Rear
INPUT Voltage
sampling cable
INPUT1
INPUT1
INPUT Voltage
sampling cable
Rear
OUTPUT Voltage
sampling cable
OUTPUT2
OUTPUT2
OUTPUT Voltage
sampling cable
Rear
MC Signal cable
MC1
MC1
MC Signal cable
Rear
Parallel signal cable
8PIN
8PIN
Parallel signal cable
Rear
CUSTOMER CAN
Cable
CUSTOMER
CAN
CUSTOMER
CAN
CUSTOMER CAN
Cable
Lower front
4.2.1.2. Install Top Exhaust Accessory
1. Remove the rear upper covers of the cabinets;
See
20
for the location of the rear upper covers
;
2. Install the top exhaust accessories to the upper back of the cabinets, using M6*16 screws
(80pc), torque: 9Nm;
See
6
for the location of the top exhaust accessories
;
3. Connect the cables among the top exhaust accessories, the primary cabinet and the
secondary cabinet, detail please see
4.
Proceed to Section
4.2.1.3.
Summary of Contents for 93PR Series
Page 1: ...60 1200 kW Installation and Operation Manual Eaton 93PR UPS ...
Page 2: ......
Page 142: ......
Page 143: ...614 40061 01 ...