6.8. Transfer UPS from Maintenance Bypass to Double Conversion Mode
To transfer the UPS back to Double Conversion Mode:
1. The normal start position should be the following:
Output
Maintenance
bypass input
Static
bypass input
Rectifier input
Bypass switch
Input switch
Output switch
Maintenance bypass switch (MBS)
Figure 6-45: Maintenance Bypass Mode
2. Turn ON the rectifier switch to connect rectifier input to UPS.
3. Turn ON the Static bypass switch toconnect UPS bypass input.
4. Turn ON the output switch toconnect UPS Inverter output.
5. Perform the UPS start-up procedure (bypass mode) in
Section
6. Turn OFF the MBS, and cut off the UPS maintenance bypass (MBS) output.
7. Refer the
Section
Transfer from Bypass to Double Conversion Mode to Double Conversion
Mode.
The UPS is now in Double Conversion Mode
Output
Maintenance
bypass input
Static
bypass input
Rectifier input
Bypass switch
Input switch
Output switch
Maintenance bypass switch (MBS)
Figure 6-46: Double Conversion Mode