10. If permanently mounting the system, proceed to Step 11; otherwise, continue to Step 13.
11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front and
rear of the UPS cabinet with the angle facing outward (see Figure 4-1 and Figure 4-3).
12. Secure the cabinet to the floor with customer-supplied hardware.
13. Proceed to paragraph 4.3.
Figure 4-2. Attaching the Ramp to the Pallet
Ramp Extension
Pallet
UPS
Cabinet
Ramp
(top panel from
wood container)
Metal Tab
(2 places)
Ramp Bracket
and M10 bolt
(2 places)
Summary of Contents for 9E
Page 1: ...Eaton 9E UPS 20 30 kVA 208 220V Generation 3 Installation and Operation Manual ...
Page 2: ......
Page 3: ...Eaton 9E UPS 20 30 kVA 208 220V Generation 3 Installation and Operation Manual ...
Page 21: ...Section 1 Installation ...
Page 22: ......
Page 65: ...Section 2 Operation ...
Page 66: ......
Page 113: ......
Page 114: ... P 164000301 1 P 164000301 1 ...