Page 13
T
HREE
-
PHASE CONNECTION
1.
(THREE-PHASE CONNECTION
9E10KI, 9E10KIXL
): Use 2 cables of cross-section 4 mm
2
(L2 and L3) and 3 with cross-
section 10 mm
2
(EARTH, N, L1) for the input (N.B.: L1 and N are of greater cross-section because in bypass operation
they have to carry all of the input current)
.
For the output use 3 cables of cross-section 10 mm
2
(EARTH, N and L).
(THREE-PHASE CONNECTION
9E15KI, 9E15KIXL
): Use 2 cables of cross-section 4 mm
2
(L2 and L3) and 3 of cross-
section 16 mm
2
(EARTH, N, L1) for the input (N.B.: L1 and N are of greater cross-section because in bypass operation
they have to carry all of the input current)
.
For the output use 3 cables of cross-section 16 mm
2
(EARTH, N and L).
(THREE-PHASE CONNECTION
9E20KI, 9E20KIXL
): Use 2 cables of cross-section 6 mm
2
(L2 and L3) and 3 of cross-
section 25 mm
2
(EARTH, N, L1) for the input (N.B.: L1 and N are of greater cross-section because in bypass operation
they have to carry all of the input current)
.
For the output use 3 cables of cross-section 25 mm
2
(EARTH, N and L).
2. Connect the wires to the respective terminals, following exactly the instructions below:
Input line
a - Ensure that the upstream magneto-thermal switch is open.
b - Connect the earth wire to screw A.
c - Connect the neutral wire to terminal 4.
d - Connect the wires of the phases to terminals 1, 2 and 3 (for L1 use red wire).
Output line
a - Connect the earth wire to screw B.
b - Connect the neutral wire to terminal 5.
c - Connect the live wire to terminal 6.
R.E.P.O.
a - The REPO connection (between terminal 5 and 6) is normally open. For more information please refer to the REPO section of
this manual
Fig.3-6 10~20K three phase input terminal view
3.
3. Tighten the terminals well, close the backpanel cover and secure it with the screws taken out earlier.
4.
For 10 to 15kVA the suggested tighten force is 1.2~1.6Nm. For 20kVA, the suggested tighten force is 2.5~3 Nm.