UPS Installation Plan and Unpacking
Eaton 9EHD UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual
3
3.2.2 UPS System Power Wiring Preparation
The UPS system installation must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The UPS equipment operating environment must meet the weight requirements shown in Table 3-1 and the
size requirements shown in Figure 3-1. Dimensions are in millimetres (inches).
WARNING
•
HIGH TOUCH CURRENT EARTH CONNECTION ESSENTIAL BEFORE CONNECTING SUPPLY.
As a result of the connected loads high leakage current is possible. Connection of the earth
(ground) is required for proper product operation. Do not check UPS operation by removal of
the Earth (ground) connection.
•
The UPS unit is not suitable for IT and corner-earthed power distribution systems.
CAUTION
If battery systems are located in the same room as the UPS, the battery manufacturer's
environmental requirements should be followed if they are more stringent than the UPS
requirements. Operating temperatures above the recommended range will result in decreased
battery life and performance, and may reduce or void the battery warranty.
The UPS ventilation requirements are shown in Table 3-4.
Table 3-4. Air Conditioning or Ventilation Requirements During Full Load Operation
Model
Rating
Input/Output Voltage
Heat Rejection
BTU/hr x1000 (kg-cal/hr)
9EHD-33-80
80 kVA
380/380 400/400 415/415
18.49 (4660)
9EHD-33-100
100 kVA
380/380 400/400 415/415
23.11(5826)
9EHD-33-150
150 kVA
380/380 400/400 415/415
34.68 (8740)
9EHD-33-200
200 kVA
380/380 400/400 415/415
46.22 (11650)
WARNING
•
RISK OF ELECTRIC SHOCK. This ups receives power from more than one source -
disconnection of the AC and the DC source is required to de - energise this unit before
servicing. After disconnecting the utility power and the DC power, authorised service
personnel should wait at least five minutes for capacitor bleedoff before attempting internal
access to the UPS module.
•
Backfeed protection is an internally fitted option on this device. If this option, or an externally
fitted backfeed contactor are not installed.
•
the below label should be applied on all primary power isolators installed remote from the
UPS area and on external access points.