UPS System Installation
Eaton 9EHD UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual
4-7
Figure 4-6. Power Terminal Locations
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A0
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
NOTES:
RCD: .xxx+/-.xxx STD: .xxx+/-.xxx
Key Dimension: *
1 RCD: Required Control Dimension ,These Dimensions need Process control
& capability(initial and ongoing), 100%inspection, poke yoke, etc.as appropriate.
2 STD: Statistically Toleranced Dimension ,These Dimensions need demonstration
of ongoing process capability (CpK/PpK).
3 Key Dimension:These Dimensions are defined by ME/Mfg,and need inspection as
appropriate. If you want more information,please review the criterions of <TC-RDW-18>and<TC-QAW-40>
TC-RDW-49-19 REV E
2011 Eaton Corporation - All Rights Reserved.
THIS DOCUMENT, INCLUDING THE DRAWING AND INFORMATION CONTAINED THEREON, IS CONFIDENTIAL AND IS THE EXCLUSIVE PROPERTY OF EATON CORPORATION, AND IS MERELY ON LOAN AND SUBJECT TO RECALL
BY EATON AT ANY TIME. BY TAKING POSSESSION OF THIS DOCUMENT, THE RECIPIENT ACKNOWLEDGES AND AGREES THAT THIS DOCUMENT CANNOT BE USED IN ANY MANNER ADVERSE TO THE INTERESTS OF EATON
AND THAT NO PORTION OF THIS DOCUMENT MAY BE COPIED OR OTHERWISE REPRODUCED WITHOUT THE PRIOR WRITTEN CONSENT OF EATON. IN THE CASE OF CONFLICTING CONTRACTUAL PROVISIONS, THIS
NOTICE SHALL GOVERN THE STATUS OF THIS DOCUMENT.
NOTICE TO PERSONS RECEIVING THIS DOCUMENT AND/OR TECHNICAL INFORMATION
EATON CORPORATION - CONFIDENTIAL AND PROPRIETARY
1 OF 1
SHEET:
1:1
SCALE:
SIZE: A0
APPROVED:
4-8
PRO-E DRAWING
SAFETY:
STATE:
DOCUMENT TYPE:
CHECKED:
MODIFIED:
REVISION:
NAME:
ECO:
ORIGINATED:
DESCRIPTION:
DIMENSIONS ARE IN MILLIMETERS AFTER PLATING, DIMENSIONS AND TOLERANCES IN ACCORDANCE WITH ASME Y14.5M-1994. SEE NOTES FOR TOLERANCES.
EATON CORPORATION
THIRD PROJECTION
METRIC
AC Output to
Critical Load
AC Input to
UPS Bypass
AC Input to
UPS Rectifier
RIGHT VIEW
FRONT VIEW
Ground Terminals
SEE DETAIL
A
Neutral (N)
Phase C (L3)
Phase B (L2)
Phase A (L1)
DC Input from External Battery -
DC Input from External B
Neutral (N)
Phase C (L3)
Phase B (L2)
Phase A (L1)
Phase C (L3)
Phase B (L2)
Phase A (L1)
Neutral (N)
SEE DETAIL
B
Ground Terminals
AC Output to
Critical Load
Ground Terminals
Phase A (Ll)
Phase B (L2)
Phase C (L3)
Neutral (N)
Neutral (N)
Phase C (L3)
Phase B (L2)
Phase A (Ll)
Neutral (N)
Phase C (L3)
Phase B (L2)
Phase A (Ll)
AC Input to
UPS Bypass
AC Input to
UPS Rectifier
DC Input from External B
DC Input from External Battery -
9EHD 80-100 kVA
Summary of Contents for 9EHD Series
Page 81: ......
Page 82: ...614 0 00...