6 4 8 Charger Control
To turn an individual UPS battery charger on:
1. Select the CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned on. The
System Control screen is displayed.
2. Select Battery on the System Control screen
3. On the Battery System Control screen, select the RESTING
CHARGING command, then press the
RETURN pushbutton.
To turn an individual UPS battery charger off:
1. Select the CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned off. The
System Control screen is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the CHARGING
RESTING command, then press the
RETURN pushbutton.
6 4 9 Battery Test
NOTE 1
NOTE 2
This UPS has a user initiated battery test intended to determine if the batteries are
able to support the load.
The battery test is only able to be initiated when the battery is fully charged. This
normally occurs within 72 hours of the start of a charging cycle. The command will
not be shown if the test is not able to be run.
To start an individual UPS battery test:
1. Select the CONTROLS symbol on the main menu bar on the UPS to be tested. The System Control screen
is displayed.
2. Select Battery on the System Control screen.
3. On the Battery System Control screen, select the RESTING
TESTING command, then press the
RETURN pushbutton.
Eaton 9EHD UPS (20-40 kVA, 380/400/415V) Installation and Operation Manual
69
Summary of Contents for 9EHD Series
Page 1: ...20 40 kVA 380 400 415V Installation and Operation Manual Eaton 9EHD UPS ...
Page 2: ......
Page 49: ...notes Eaton 9EHD UPS 20 40 kVA 380 400 415V Installation and Operation Manual 41 ...
Page 88: ......
Page 89: ......
Page 90: ...614 00386 00 ...