Page 4
9PX 1-3 KVA US_EN
SAFETY INSTRUCTIONS
Special precautions
•
The unit is heavy: wear safety shoes and use vacuum lifter preferentially for handling operations.
•
All handling operations will require at least two people (unpacking, lifting, installation in rack
system).
•
Before and after the installation, if the UPS remains de-energized for a long period, the UPS
must be energized for a period of 24 hours, at least once every 6 months (for a normal storage
temperature less than 25°C). This charges the battery, thus avoiding possible irreversible damage.
•
During the replacement of the Battery Module, it is imperative to use the same type and number of
element as the original Battery Module provided with the UPS to maintain an identical level of
performance and safety. If there are any questions, don’t hesitate to contact your EATON
representative.
•
All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY.
There are NO USER SERVICEABLE PARTS inside the UPS.
•
For potential safety issue on defective UPS : DISCONNECT INTERNAL BATTERY for storage and
transportation.
Summary of Contents for 9PX 1000i RT2U
Page 46: ...Page 46 9PX 1 3 KVA US_EN...