Page 22
5-6kVA EU_EN
3.9 Installation depending on the system earthing arrangement (SEA)
Change in SEA between upstream and downstream or galvanic isolation required
8
10
8
10
or
Normal AC
Load
Main low
voltage
switchboard
(MLVS)
Isolation
transformer
Normal AC
Load
Main low
voltage
switchboard
(MLVS)
Isolation
transformer
3. Installation
Summary of Contents for 9PX 5000
Page 2: ...Page 2 5 6kVA EU_EN ...
Page 44: ...Page 44 5 6kVA EU_EN ...