Page 17
614-09354-01_EN
ENGLISH
4.
Insert the Normal AC source cable through the cable gland.
5.
Connect the wires to the Normal AC source (Input) terminal blocks (do not remove the Input Bypass AC
jumper
4
and the UPS Input Bypass jumper inside the UPS I/O cover refer to the UPS User Manual)
6.
Insert the Output cable through the cable gland.
7.
Connect the wires to the Output terminal blocks.
8.
Tighten the cable glands.
9.
Slide back and secure the ModularEasy I/O cover
3
with the 2 screws.
10.
Check EBM connected to UPS.
11.
Connect the two UPS together with the 9PX parallel cable and lock it.
Use of specific parallel cable is mandatory for first start up and optimal use.
4. Power cables connection
Summary of Contents for 9PX 8000i RT6U HotSwap Netpack
Page 2: ...9PXMEZ6Ki 9PXMEZ11Ki Installation and user manual English Fran ais Deutsch Espa ol...
Page 3: ......
Page 100: ...ModularEasy 9PXMEZ6Ki 9PXMEZ11Ki Copyright 2014 EATON 614 09354 01_RU...
Page 102: ...3 614 09354 01_RU ModularEasy 15 C 60 C ModularEasy EATON Eaton ModularEasy...
Page 107: ...8 614 09354 01_RU 2 2 3 UPS NMC Ready Eaton 2 4 1 2 Power 1 2 3 1 1 2 0 1 0 2 5 Enter...
Page 109: ...10 614 09354 01_RU 3 3 4 3 5 9RK...
Page 110: ...11 614 09354 01_RU 3 3 6 19 EBM 9PX EBM 240V 3 7 Trollet Frame BINTSYS 9PXMEZ11Ki 9PXMEZ6Ki...
Page 114: ...15 614 09354 01_RU 4 10 1 ModularEasy 11 9PX...
Page 124: ......
Page 125: ...www eaton com Powerquality EATON 9PX_ModularEasy 614 09354 01...