Special Precautions
•
The unit is heavy: wear safety shoes and use vacuum lifter preferentially for handling operations.
•
All handling operations will require at least two people (unpacking, lifting, installation in rack
system).
•
Before and after the installation, if the UPS remains de-energized for a long period, the UPS must
be energized for a period of 24 hours, at least once every 6 months (for a normal storage
temperature less than 25°C). This charges the battery, thus avoiding possible irreversible
damage.
•
During the replacement of the Battery Module, it is imperative to use the same type and number
of element as the original Battery Module provided with the UPS to maintain an identical level of
performance and safety. If there are any questions, don’t hesitate to contact your local EATON
representative.
•
All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY.
There are NO USER SERVICEABLE PARTS inside the UPS.
•
For potential safety issue on defective UPS : DISCONNECT INTERNAL BATTERY for storage and
transportation.
Summary of Contents for 9PX1000IRTANZ-L
Page 34: ...28 Eaton 9PX Lithium Ion P 164001006 Rev 01 UPS Remote Control Functions...
Page 44: ...38 Eaton 9PX Lithium Ion P 164001006 Rev 01 Recycling The Used Equipment...
Page 48: ...42 Eaton 9PX Lithium Ion P 164001006 Rev 01 CE Compliance Contact...
Page 53: ...Eaton 9PX Lithium Ion P 164001006 Rev 01 47 Model Specifications...
Page 54: ...P 16400100601 P 164001006 01...