50
4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 09
Figure 42. Super Charger Location
Super
Charger
Battery
Modules
Battery
Modules
EBM Front View
(Covers removed)
UPS DC
Terminal
Covers
DC Emergency
Disconnect
Switch
Communication
Ports
EBM
UPS AC
Terminal
Covers
EBM Front
EBM Back
Prepare the EBM Cabinet
NOTE 1
The external battery cabinets are the same dimensions as the UPS cabinets. Refer to
the ”
” section for unpacking and cabinet setup.
NOTE 2
If you are installing multiple EBM(s) upstream to the UPS, repeat the setup as described
in this section.
1.
Open the carton containing the external battery cabinet cable assembly and position it in the desired
location next to the UPS.
2.
If you are rack-mounting the EBM cabinet, refer to the UPS rack-mount installation procedure (see
). If not, proceed to the next step.
3.
Install the anchor brackets to the floor if applicable (see
).
Summary of Contents for 9PXM
Page 1: ...p n P 164000669 Revision 09 Eaton 9PXM UPS 4 20kVA Users Guide Eaton 9PXM UPS ...
Page 4: ......
Page 8: ...viii 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Table of Contents ...
Page 12: ...xii 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 List of Figures ...
Page 14: ...xiv 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 List of Tables ...
Page 22: ...8 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Physical Features ...
Page 110: ...96 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Communication Slots ...
Page 130: ...P 16400066909 P 164000669 09 ...