52
4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 09
Figure 44. Battery Cable Assembly Installation
Screws
Screws
Ground
Lug
Cover
DC+ DC- DC- DC+
G L1 N L2
To UPS
DC input cables from
upstream EBM
(if installed)
Terminal
Block
Terminal
Block
To Dedicated 30 Amp
Circuit.
NOTE
Torque the screws holding all input and output power conductors to the values specified
in
.
2.
Connect the EBM DC Cables to the applicable terminals by removing and reinstalling the screws onto the
terminal blocks.
NOTE
DC input cables only required if EBM(s) are installed upstream.
3.
Connect the AC cables to the applicable terminals by inserting the ends into the AC terminal block and
tighten the screws depending on the EBM configuration option as follows:
Option #1
No AC Input :
Extended Run-Time Battery Support option with no UPS communication (see
).
Figure 45. No AC Input
Option #2
Summary of Contents for 9PXM
Page 1: ...p n P 164000669 Revision 09 Eaton 9PXM UPS 4 20kVA Users Guide Eaton 9PXM UPS ...
Page 4: ......
Page 8: ...viii 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Table of Contents ...
Page 12: ...xii 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 List of Figures ...
Page 14: ...xiv 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 List of Tables ...
Page 22: ...8 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Physical Features ...
Page 110: ...96 4 20kVA Users Guide P 164000669 4 20kVA Users Guide P 164000669 Rev 09 Communication Slots ...
Page 130: ...P 16400066909 P 164000669 09 ...