30
1.
Input:
I. Connect the main-ground cable (PE) to the chassis
II. Bridge the
‘AC input terminal N/N’ with ‘busbar #1’, then connect the AC cable
(N) to it
III.
Bridge the ‘AC input terminals mL1/bL1/mL2/mL3 with ‘busbar #8’, then connect
the AC cable (L) to it
2.
Output:
I. Connect the ground cable (PE) to the chassis
II. Bridge the
‘AC segment terminal N/N’ with ‘busbar #1’, then connect the AC
cable (N) to it
III.
Connect the ‘AC segment terminals L1/L2/L3’ to the AC cables (L1/L2/L3)
3.
Connection to the UPS:
I. Remove all the busbars of the UPS
II.
Connect the UPS to the MBP with the ‘Cable to UPS1’ included in the MBP’s
accessory
Note:
Bypass is not available in this mode. Please use with caution.
Summary of Contents for 9SX 15K Series
Page 1: ...1 Eaton 9SX 15 20K Series Maintenance ByPass MBP MBP20K MBP20KPDU MBP20KPARA...
Page 2: ...Copyright 2020 EATON All rights reserved...
Page 50: ...50...
Page 53: ...53 Appendix 1 System block diagram...
Page 55: ......
Page 56: ...614 40048 00...