41
cable (L3) to it
2.
Output:
I. Connect the ground cable (PE) to the chassis
II. Bridge the
‘AC segment terminal N/N/N’ with ‘busbar #3’, then connect the AC
cable (N) to it
III. Connect the
‘AC segment terminal L1/L2/L3’ to AC cable (L1/L2/L3)
3.
Connecting to UPS 1 and UPS 2:
III. Remove all busbars of the UPS
IV.
Connect UPS 1 and UPS 2 to the MBP with ‘Cable to UPS 1’ and Cable to UPS
2’ included in the MBP’s accessory
3.3.4
Mode 3-3(Dual source)
:
Summary of Contents for 9SX 15K Series
Page 1: ...1 Eaton 9SX 15 20K Series Maintenance ByPass MBP MBP20K MBP20KPDU MBP20KPARA...
Page 2: ...Copyright 2020 EATON All rights reserved...
Page 50: ...50...
Page 53: ...53 Appendix 1 System block diagram...
Page 55: ......
Page 56: ...614 40048 00...