THIS INSTRUCTION LEAFLET IS NOT A COMPLETE
SOURCE OF INFORMATION ON THE TRANSFER
EQUIPMENT. INSTALLATION SHOULD NOT BE
STARTED UNTIL THE ENTIRE INSTRUCTION BOOK
HAS BEEN REVIEWED AND UNDERSTOOD. FAIL-
URE TO FOLLOW INSTRUCTIONS CAN RESULT IN
DEATH, SEVERE PERSONAL INJURY OR PROPER-
TY DAMAGE.
Step 1: Mount the transfer switch on a flat rigid surface
(Figure 1). Shim if necessary. For seismic mounting
requirements, check the instruction book.
Non-Automatic Transfer Switch
Quick Start Instructions
Instruction Leaflet
Effective June 2003
IM01602002E
For more information visit: www.cutler-hammer.eaton.com
!
WARNING
Figure 1 Mounting Details
Shim if Necessary