37
least.
For Tower module, should turn the MBS to bypass and switch off the input and
then replace the EBM(s).
For RT module, if PDU is connected with the UPS, should turn the MBS to
bypass and switch off the input and then replace the EBM(s). If PDU is not
connected with the UPS, should turn off the UPS and then replace the EBM.
To replace the EBM(s):
1. Unplug the EBM power cable from the UPS.
If additional EBM(s) are installed, unplug the EBM power cable from each EBM.
2. Replace the EBM(s). See "Recycling the used equipment" refer to chapter
7.5
for proper disposal.
A small amount of arcing may occur when connecting the EBM to UPS.
This is normal and will not harm personnel. Please connect the EBM
cable to the UPS quickly and firmly.
3. Plug the EBM cable(s) into the battery connector(s).
4. Verify that the EBM connections are tight, and there are adequate bend radius
and strain relief exist for each cable.
Testing new batteries
1. Charge the batteries for 48 hours.
2. By pressing on the menu of “Control”.
3. Select Control then Single battery test.
The UPS can starts battery test only in line mode without active alarms.
During the battery test, the UPS transfers to Battery mode and discharges the
batteries for 10 seconds. The front panel displays
and the percentage of the
test completed.
7.5 Recycling the used equipment
Contact your local recycling or hazardous waste center for information on
proper disposal of the used equipment.
Do not dispose of the batteries in the fire. Which may cause battery explosion.
The batteries must be rightly disposed according to local regulation.
Do not open or destroy the batteries. Escaping electrolyte can cause injury to the
skin and eyes. It may be toxic.
Summary of Contents for DX RT 10K UPS
Page 1: ...Eaton DX RT Online UPS 6000 10000VA XL IN USER MANUAL ...
Page 2: ......
Page 38: ...31 ...
Page 55: ...48 ...
Page 56: ...49 614 02180XT1 ...