background image

Surge Supression Device  - 300961 type 1 and 300962 type 1&2 

Before Installation: 

Verify that the system is wired in a Three Phase Star configuration and that the voltage rating of the system matches the 

voltage rating of the SPD as shown on the label.  
If the Neutral to Earth voltage is greater than 5 VAC, then a problem may exist in the electrical system. The SPD may be installed; however, a 
qualified person should be consulted to correct the problem. 

Installation Instructions: 
• 

Fit SPD mounting bracket assembly to the back plate in the position shown 

• 

Fit 63A 4P MCB onto the stabs with the back end hooked on the din rail whilst 

fitting the SPD device on the din rail next to it. Tighten the MCB terminals to 2.4Nm 

• 

Connect the EARTH wire to the nearest bolt on common earth.  

Energise the System.  

The Indicator should remain green. If the indicator turns RED, 

de-energise and contact the Technical Services department. 

 

2.4Nm 

Separation Shield - 300965 

In some arrangements, when the distribution board is used in a cluster, a 20mm spacer 
 

is required to allow the bottom and top of the boards to be flush 

 

 

A separation shield is required when 

boards are mounted on top of each other and a barrier is required between them.  

Position the separation shield 
inside the board and fix with 
M5 screws provided.  

Alignment Spacer- 300966 

Fit the spacer to the top or bottom of the board and 
fix with M5 screws. The removed Distribution board 
gland plate can be refitted to the spacer if required.   

20mm 
spacer 

SPD mounting 

bracket assembly 

Remove shield from stabs 

before fitting the SPD  

feeder MCB 

H630 x W440 

x D130 mm 

H1260 x W440 

x D130 mm 

H900 x W440 

x D130 mm 

Reviews: