MEMSHIELD 3 SURGE PROTECTION DEVICE INSTALLATION INSTRUCTIONS FOR

EM3SSK3T2 AND EM3SSK3T12

Instruction  leaflet  LT1193  (1

2

/

1

8

)

IMPORTANT NOTES

1. This product should be installed, commissioned and maintained by or under the supervision of a competent electrician

in accordance with current electrical engineering Codes of Practice, Regulations for the Electrical equipment of

Buildings (BS7671), CDM2007 - Construction (Design and Management) Regulations 2007, HSG150 - Health and

Safety in Construction, Statutory requirements and any Specific instruction issued by the Company.

2. After completing the installation and testing of this product it is essential that this leaflet is drawn to the attention of

the person responsible for its future operation and maintenance, and is at all times available for ready reference.

3. These notes assume throughout that the product is disconnected from the supply. It is essential that this is done

before any work is carried out.

FIG.2. Cabling

Wiring Diagram

NEUTRAL

EARTH

FIG.1.

Side of

Memshield  3

Type B Board

L1

L2

L3

N

SPD

NEUTRAL

EARTH

L2

L3

SPD

Supplied

63A MCB

MCB

27mm

Dia.  Hole

4 x 6mm

Dia.  Holes

L1

E

N