1.1 General Information

Mounting work may only be performed by skilled electrical 

personnel (see DIN VDE 0105 part 1, the German Accident 

Prevention Regulation BGV A2 of the Association of 

Commercial and Industrial Workers’ Compensation Insu-

rance Carriers, or analogous regulations and guidelines in 

the country where the equipment is to be installed and 

operated). Other persons may only perform the activities 

described in these instructions if
– they have received proper and professional instruction,
– their tasks and activities have been precisely defined 

and understood,
– the activities are performed under the oversight and 

supervision of experienced and expert personnel.
When working with these mounting and installation 

instructions, special attention must be paid to the notes 

marked with symbols and key words as follows.

1.2 Description of Symbols

In these operating instructions, important safety-related 

notes are labelled with symbols.

 NOTE:

Provides important tips and advice on the procedures to 

be followed or on the handling of the device or compo-

nents described.

 ATTENTION!

Draws attention to possible sources of danger that might 

cause damage to equipment or components, as well as to 

the environment.

 WARNING!

Draws attention to possible sources of danger that might 

cause personal injury or severe damage  

to equipment or components, as well as to the environ-

ment.

 DANGER!

Draws attention to possible sources of danger that might 

cause life-threatening personal injury or  

extreme damage that indirectly endangers people or the 

environment.

 WARNING!

The depictions in these mounting and installation instruc-

tions only serve, to some extent, as illustrations of the 

content matter. Wherever
• dimensionally accurate work or
•  precise drawings adapted to on-site characteristics are 

required,

it is mandatory to comply with the drawings that have 

been specially created for the equipment.

 WARNING!

Only perform work for which you possess sufficient 

technical qualifications and for which you have received 

instruction regarding the on-site operating conditions!
Extensions, modifications, repairs and other routine work 

not described in these instructions are to be reserved for 

specially trained specialist and service personnel (from the 

manufacturer CEAG or from vendors and service providers 

authorised by CEAG)!

1.3  Information regarding the Mounting and 

Installation Instructions

Please keep these mounting and installation instructions 

safe, as they form an integral part of the delivered fire 

safety enclosure. Safe and approved functioning can only 

be assured by observing these instructions.

1.4 Further Applicable Documents

In addition to these mounting and installation instructions, 

the mounting and operating instructions for the central 

battery system ZB-S must also be observed.

1.5 Liability and Guarantee

All indications and notes in these mounting and installation 

instructions were compiled taking account of  

the regulations in effect, the state of the art, and our long-

standing knowledge and experience. The mounting and 

installation instructions must be stored in the immediate 

vicinity of the device and must be available at all times 

to all persons who work on or with the device. These 

mounting and installation instructions must be read care-

fully before the start of all work performed on or with the 

device!

1.6 Copyright Protection

The mounting and installation instructions are to be 

handled confidentially. They are exclusively for the use of 

persons engaged in work on and with the device. All indi-

cations, texts, drawings, images and other representations 

contained in the instructions are protected by copyright 

law.

1.7 Spare Parts

Only use original spare parts from the manufacturer.
Incorrect or faulty spare parts can cause damage, malfunc-

tioning or the complete failure of the device.

 WARNING!

The use of unapproved spare parts causes all guarantee, 

service, damage and liability claims to be forfeited.

1.8 Disposal

If no return or disposal agreement has been reached, 

disassembled components are to be conveyed to be recy-

cled after appropriate dismounting.

Summary of Contents for ESF-E30 Series

Page 1: ...ng and Operating Instructions CEAG Mains Distribution Cabinet with Circuit Integrity Type ESF E30 Target group part 1 Qualified electrician acc to EN 50110 1 Target group part 2 Electrical instucted p...

Page 2: ...he Operator 4 2 5 Personnel Requirements 4 2 6 Operational Safety 4 3 TECHNICAL DATA 5 4 LAYOUT 6 4 1 Layout of ESF E30 13 S 6 4 2 Layout of ESF E30 28 7 4 3 Dimensional Drawings of ESF E30 13 with op...

Page 3: ...G Only perform work for which you possess sufficient technical qualifications and for which you have received instruction regarding the on site operating conditions Extensions modifications repairs an...

Page 4: ...ing cable entry point etc must be observed 2 1 Approved Use The mains distribution box with circuit integrity type ESF E30 is to be used for the battery supported monito ring and power supply of safet...

Page 5: ...Cable entries with pre stamped flange plate 40 x M20 2 x M25 8 x M18 4 x M32 59 x M25 9 x M 16 4 x M40 Type of protection IP42 IP54 with optional IP54 cover IP42 IP54 with optional IP54 cover Insulat...

Page 6: ...lots for electrical equipment circuit changer 4 Options and system components 5 Thermostatic control of internal temperature 6 Thermostatic control of external temperature 7 Axial fan 160 m3 h 8 Modul...

Page 7: ...ter 3 Module slots for electrical equipment circuit changer System components and options 4 Thermostatic control of internal temperature 5 Thermostatic control of external temperature 6 Diagonal fan 2...

Page 8: ...nting Plate MANUAL ESF E30 40071860041 G November 2018 www ceag de 4 3 Dimensional Drawings of ESF E30 13 with optional Wall Mounting Plate 955 1150 403 885 921 350 350 350 12 2 0 Cable entries prepar...

Page 9: ...ate MANUAL ESF E30 40071860041 G November 2018 www ceag de 1 Sheet steel cabinet 2 Optional mounting area 3 Ventilation grid outlet incl filter pad 4 Ventilation grid inlet incl filter pad 5 Bar locki...

Page 10: ...thout Wall Mounting Plate MANUAL ESF E30 40071860041 G November 2018 www ceag de 4 4 Dimensional Drawings of ESF E30 13 without Wall Mounting Plate Cable entries prepared for 4 pcs M32 8 pcs M18 2 pcs...

Page 11: ...NUAL ESF E30 40071860041 G November 2018 www ceag de 1 Sheet steel cabinet 2 Fixing holes 12 mm 3 Ventilation grid outlet incl filter pad 4 Ventilation grid inlet incl filter pad 5 Bar locking system...

Page 12: ...nsional Drawings of ESF E30 28 MANUAL ESF E30 40071860041 G November 2018 www ceag de 4 5 Dimensional Drawings of ESF E30 28 Cable entries prepared for 60 pcs M25 8 pcs M16 4 pcs M40 885 1990 200 400...

Page 13: ...ANUAL ESF E30 40071860041 G November 2018 www ceag de 1 Sheet steel cabinet 2 Ventilation grid outlet incl filter pad 3 Ventilation grid inlet incl filter pad 4 Bar locking system with crosspoint clos...

Page 14: ...ly valid edition see www dibt de Sealing All types of cable insertion must be performed by specia lists Insertion of cables in the enclosure It must be ensured that fire safety cables are always inser...

Page 15: ...ure The cables have to meet circuit integrity which is required on site Put the cable sheats through the cable cooling room and insert the cable cores into the electrical operating room by using the s...

Page 16: ...Interior wall mounting by wall mounting holes Cable seizure The cables have to meet circuit integrity which is required on site Put the cable sheats through the cable cooling room and insert the cable...

Page 17: ...d fire behaviour properties to the building authority requirements in accordance with Building Regu lations List A Part 1 Annex 0 2 1 or 0 2 2 in the respec tively valid edition see www dibt de Cable...

Page 18: ...room and insert the cable cores into the electrical operating room by using the second separation Detail X Cable cooling room Electrical operation room Screw connection For mounting the distributor h...

Page 19: ...icado de acuerdo con la normativa de seguridad y prevenci n de accidentes Los dispositivos deben utilizarse de acuerdo con su uso previsto en buen estado y sin da os Retire todos los objetos que no pe...

Page 20: ...que se de que n o pode ser ligada e verifique se n o existe tens o O supramencionado aplica se rede el trica energia de reserva e poss vel tens o de controlo e externa N o desligue os circuitos sob ca...

Page 21: ...21 Notes MANUAL ESF E30 40071860041 G November 2018 www ceag de Notes...

Page 22: ...22 Notes MANUAL ESF E30 40071860041 G November 2018 www ceag de Notes...

Page 23: ...23 Notes MANUAL ESF E30 40071860041 G November 2018 www ceag de Notes...

Page 24: ...eering services critical industries around the globe count on Eaton We power businesses with reliable efficient and safe electrical power management solutions Combined with our personal service suppor...

Reviews: