33
Commissioning and start-up
OperatiOnal manual
MN156001EN October 2015 www.eaton.com
3.
Press Generate Report if you want to produce a report
of the test results.
A screen displays indicating that a USB storage device
is required.
4.
Press OK when USB storage device is installed.
5.
Press OK.
The report is saved as a csv file on the USB
storage device at:
*:\PUBLIC\PROJECTS\ACTIVEFILTER\DATA\ALARM\
COMMISSIONINGREPORT
6.
Press Finish to complete the commissioning procedure.