Flexi -3G Installation & Commissioning Manual
Chapter 3. Installation Procedure
Document No: - 4493-CM-EN-10989402
Page 33 of 94
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
1
Power Cabinet
3 Wall Mounting Apertures
Fig. 3-11 Power Cabinet-DC Distribution Cover Insulator Removed
3.
Mark the wall through the Wall Mounting Apertures of the Power Cabinet with permanent marker.
4.
If necessary, remove the Power Cabinet from the Battery Cabinet, by removing the Power Cabinet
to Battery Cabinet Fixings.
5.
Drill all marked holes. De-burr all holes.
6.
Place Power Cabinet on to Battery Cabinet and secure using the Power Cabinet to Battery Cabinet
Fixings.
7.
Tighten the Power Cabinet to Battery Cabinet Fixings to a torque of 2.9Nm.
8.
Fix Power Cabinet using appropriate wall anchors to secure the cabinet.
9.
If fitted, refit the DC Distribution Cover Insulator to the Power Cabinet and secure using the 2 plastic
push rivets
1
3
3