Flexi -3G Installation & Commissioning Manual
Chapter 4. Battery Installation
Page 42 of 94
Document No: - 4493-CM-EN-10989402
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
4.5.4. Fitting the Battery Links
1
Battery Cabinet
2
Battery Shelf 1
3
Battery Shelf 2
6
Battery 1
7
Battery 2
8
Battery 3
9
Battery 4
10 Battery Terminal Cover
11 Battery Link 1-2
12 Battery Link 2-3
13 Battery Link 3-4
Fig. 4-6 Fitting the Battery Links
1.
Remove the left-hand Battery Terminal Cover from Battery 1 and the right-hand Battery
Terminal Cover from Battery 2
2.
Fit the Battery Link 1-2 and secure with the Link Fixings.
3.
Tighten the Link Fixings to the torque recommended by the battery manufacturer.
The torque for the Link Fixings will be on the battery label.
4.
Refit the Battery Terminal Covers to Batteries 1 & 2
5.
Remove the left-hand Battery Terminal Cover from Battery 2 and the right-hand Battery
Terminal Cover from Battery 3
6.
Fit the Battery Link 2-3 and secure with the Link Fixings.
7.
Tighten the Link Fixings to the torque recommended by the battery manufacturer.
8.
Refit the Battery Terminal Covers to Batteries 2 & 3.
9.
Remove the left-hand Battery Terminal Cover from Battery 3 and the right-hand Battery
Terminal Cover from Battery 4
10.
Fit the Battery Link 3-4 and secure with the Link Fixings.
11.
Tighten the Link Fixings to the torque recommended by the battery manufacturer.
12.
Refit the Battery Terminal Covers to Batteries 3 & 4.
1
2
3
9
8
7
6
11
10
13
12