Flexi -3G Installation & Commissioning Manual
Chapter 7. Installation of DC Cables
Page 66 of 94
Document No: - 4493-CM-EN-10989402
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
7.2. Load cable installation
7.2.1. Remove panels (if fitted)
1
Power Cabinet
2 DC Distribution Cover Insulator
Fig. 7-1 Power Cabinet
1.
Check that the load MCB(s) being worked on are switched off.
2.
Remove the 2 plastic push rivets securing the optional DC Distribution Cover Insulator to
the Power Cabinet, remove the cover and set aside.
2
1