Flexi -3G Installation & Commissioning Manual
Chapter 3. Installation Procedure
Page 24 of 94
Document No: - 4493-CM-EN-10989402
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
3.3. Assembling the Battery Cabinet
3.3.1. Positioning the Side Panels
1 Side Panel LH
2 Side Panel RH
Fig. 3-2 Positioning the Side Panels
1.
With the aid of an assistant, position the Side Panel LH and Side Panel RH, on a level surface,
approximately 600mm apart, as shown in Fig. 3-2 above
1
1
2
2