Installation guide: 

Green Motion Building Pro

Green Motion chargers

Scan here for 
Spanish translations 

Scannez ici pour 
les traductions en 
espagnol

Summary of Contents for Green Motion Building Pro

Page 1: ...Installation guide Green Motion Building Pro Green Motion chargers Scan here for Spanish translations Scannez ici pour les traductions en espagnol...

Page 2: ...LLATION Safety information 3 General reference 4 A Preparing the EV charger s 5 B Mount an EV charger to a wall 8 C Mount an EV charger to a pedestal 11 D Mount a second EV charger to a pedestal 16 FC...

Page 3: ...bolt 18 8 Stainless Steel Hex Head Screw 1 4 20Thread Size 3 4 Long P 1 4 20 serrated flange nut High Strength Steel Serrated Flange Locknut Grade 8 Zinc Plated 1 4 20Thread Size R 1 4 Stainless Stee...

Page 4: ...link Blue Long Red Charging EVSE EV Fault 1 No Blink Green Short Blue Vehicle connected Idle Ready 1 Refer to the troubleshooting section for help on various faults Idle green Charging blue Fault red...

Page 5: ...CTRIC VEHICLES ONLY PREMISE VENTILATION NOT REQUIRED THIS DEVICE SHOULD BE SUPERVISED WHEN USED AROUND CHILDREN WARNING TURN OFF OR DISCONNECT THE POWER SUPPLYING THIS EQUIPMENT BEFORE BEGINNING WORK...

Page 6: ...ore than 4 ft 1 2 m above the floor level for indoor loca tions and 24 inches 600 mm above the grade level for outdoor locations WARNING Risk of Explosion This equipment has arcing or sparking parts t...

Page 7: ...is setting Default password to access Admin settings is eaton Users will be required to update to a stronger password Table below provides Circuit Breaker rating required for each output current optio...

Page 8: ...INSTALLATION PEDESTAL INCLUDED punch out the larger knockout hole as pictured Only punch out the smaller knockout if you plan to install ethernet Do not reinstall lower front panel For ethernet For re...

Page 9: ...card and insert a new SIM Place the SIM card module back into its slot on the printed circuit board Pay attention to the orientation of the SIM card module to avoid damage The black wire connecting t...

Page 10: ...Align mounting plate C on wall and secure with four M6 screws F If no stud is available use an anchor E provided Align premium holster D and secure with two M6 screws F If no stud is available use an...

Page 11: ...L1 L2 YAD4CM6E14 Recommended lug GND YAD8CM5E10 Torque lbf in 40 WireType Copper ScrewType L1 L2 M6 GND M5 Caution Follow all local electric codes when wiring this EV Charger Local electric code shal...

Page 12: ...EV CHARGER RE CHECK ALL ELECTRICAL CONNECTIONS AFTER ALL WIRING HAS BEEN COMPLETED Reconnect power to the upstream circuit by switching circuit breaker to the ON position Energize the loadcenter or t...

Page 13: ...estals remove the top and bottom panels On the front of the pedestal remove the four 1 4 20 Hex head bolts neoprene washers and 1 4 20 serrated flange nuts Remove NEMA plug Only remove second NEMA plu...

Page 14: ...tall the premium cord holster D onto the pedestal with the two 1 4 20 Hex head bolts N neoprene washers R and 1 4 20 serrated flange nuts P STEP C 4 Reference 1 4 20 Hex head bolt N x6 Neoprene washer...

Page 15: ...and two 1 o rings J to secure it on the interior of the charger A and on the interior of the EV pedestal IF INSTALLING ETHERNET secure the 1 2 threaded plastic pipe nipple K using a 1 2 plastic nut L...

Page 16: ...efully plug into the RJ45 connector L1 L2 Ground Ethernet RJ45 connector 48 A 40 A 32 A Recommended Wire Gauge L1 L2 4 AWG 6 AWG 8 AWG Recommended Wire Gauge GND 10 AWG 10 AWG 10 AWG Recommended lug L...

Page 17: ...circuit breaker to the ON position Energize the loadcenter or the panelboard The EV charger A electronics should power immediately and the LCD will indicate the status of the charger Replace the lowe...

Page 18: ...rence Mounting plate C 1 2 o ring M 1 4 20 Hex head bolt N x3 Neoprene washer R x3 1 4 20 serrated flange nuts P x3 Install the mounting plate C to the top panel using the top three holes with 1 4 20...

Page 19: ...0 serrated flange nut to secure the lower mounting hole IF INSTALLING ETHERNET be sure the 1 2 o ring M is correctly seated around the smaller hole Then feed the 1 2 threaded plastic pipe nipple K thr...

Page 20: ...ing 10 silver speed screws Reference Premium cord holster D 1 4 20 Hex head bolt N x2 Neoprene washer R x2 1 4 20 serrated flange nuts P x2 STEP D 4 STEP D 5 Replace both lower front panels of the EV...

Page 21: ...visual inspection at the time of use of the cable for cracks nicks or cuts to ensure the integrity of the cable There should be visual inspection of the connector for damage and contamination prior t...

Page 22: ...ee 3 year from the date of original purchase In the event any Product fails to comply with the foregoing warranty Seller will at its option either a repair or replace the defective Product or defectiv...

Page 23: ...f the EV charger is wired properly and the circuit breaker is closed Restore the EV connector back to the charger and try to reset the circuit breaker powering the charger If the problem still persist...

Page 24: ...oulevard Cleveland OH 44122 United States Eaton com 2023 Eaton All Rights Reserved Printed in USA Publication No IL191021EN Rev 01 Eaton is a registered trademark All trademarks are property of their...