58
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
2.
Line-Up-and-Match Wiring.
Route the battery shunt trip interface wiring from the UPS battery shunt trip
interface terminals through the bottom inter-cabinet access pass-through (see
) of the UPS
cabinet and IBC to the IBC battery interface terminal block TB2. See
or
for terminal
locations. See paragraph
,
or
, and
for
wiring and termination requirements. Refer to the applicable Eaton 93PM UPS Installation and Operation
manual listed in paragraph
, for UPS cabinet terminal locations.
3.
Proceed to
4.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IBC sidecar. Identify
all conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate
prior to mounting on the IBC. Install the conduit plate and install all conduit runs into the plate. Pull the
wiring through the conduit into the wiring area.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
5.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the top of the IBC sidecar and the top IBC inter-cabinet wiring access pass-through (see
) to the
IBC battery interface terminal block TB3.
6.
Proceed to
7.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
8.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the bottom of the IBC to the IBC battery interface terminal block TB2.
9.
Connect the battery shunt trip interface wiring to the IBC battery shunt trip interface terminals. See
paragraph
and
for termination requirements.
For a detailed view of the IBC terminal block, see
or
.
10. Connect the battery shunt trip interface wiring to the UPS battery shunt trip interface terminals. Refer to
the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
, for UPS cabinet termination requirements.
NOTE
In the following step, if the safety shield cannot be reinstalled because of misalignment,
use the leveling feet to realign the cabinet.
11. Reinstall the internal safety shield panel removed in
of paragraph
Line-Up-and-Match Power Wiring
12. Close the outside door and secure the latch.
13. If removed, reinstall the sidecar internal safety shield panel and secure with the retained hardware.
14. If removed, reinstall the sidecar front panel and secure with the retained hardware.
15. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation and
Operation manual, listed in paragraph
, to complete the UPS wiring.