28
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
•
Because of the battery shunt trip wiring route in the 93PM UPS cabinet, the wiring from the IBC to the
UPS must use wire rated for 600V and Class 1 wiring methods.
•
The battery detect signal wiring from the battery cabinet must be connected to a programmed UPS
building alarm.
•
Battery detect and 48 Vdc shunt trip wiring should be a minimum of 18 AWG.
•
Use twisted-pair wires for each input and return or common.
•
All interface wiring and conduit is to be supplied by the customer.
•
Interface wiring can be installed using the inter-cabinet wiring access pass-through or by routing wiring
through conduit between cabinets.
•
Install the interface wiring in separate conduit from the power wiring.
33..33
IInnssppeeccttiinngg aanndd U
Unnppaacckkiinngg tthhee IIB
BC
C
The cabinet is shipped bolted to a metal and wood pallet (see
or
), and covered with outer
protective packaging material.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified in
become void.
This service is offered as part of the sales contract for the UPS. Contact an Eaton service
representative in advance (usually a two-week notice is required) to reserve a preferred
startup date.
WARNING
The IBC is heavy (see
). If unpacking and unloading instructions are not closely followed, the cabinet
may tip and cause serious injury or death.
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION
Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative
immediately.
NOTE
For the following step, verify that the forklift or pallet jack is rated to handle the weight
of the cabinet (see
for cabinet weight).
2.
Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks
between the supports on the bottom of the pallet. See
or
for the IBC-L cabinet center of
gravity measurements.
CAUTION
Do not tilt the more than 10° from vertical or the cabinets may tip over and cause serious injury or death.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft) on each side for
removing the cabinet from the pallet.
4.
Remove the protective packaging material from the cabinet and recycle in a responsible manner. Retain
the parts kit box packed at the top of the cabinet.
Summary of Contents for IBC-L